Bruce Builders was pleased to partner with the City of Monticello on critical improvements to the Monticello Wastewater Treatment Facility, which serves more than 22.5 miles of sanitary sewer infrastructure and treats flows prior to discharge into the Sangamon River watershed. The project involved developing a new, modernized treatment facility around the existing plant, all while maintaining uninterrupted operations.
Key enhancements included replacement of major system pumps and drives, installation of fiber connectivity to support a new SCADA system, and conversion from LP to natural gas service. Work extended across multiple process areas, including screening and headworks, grit handling, and flood mitigation, with new basins, flood walls, and protective measures implemented to strengthen facility resiliency.
The Bruce Builders team modernized the Office, Laboratory, and Control buildings with new electrical services, switchgear, roofing, and structural improvements designed to elevate critical systems above the 500-year floodplain. Significant process improvements included installation of a new Aeromod system, encompassing lagoon removal, sludge excavation, structural concrete placement, piping, catwalks, and connection to a new 18-inch sanitary feeder. A new Biosolids building was delivered with precast wall systems, hollow-core roof panels, storage floors, a generator, a makeup air unit, and full rotary press support equipment. Additional work included installation of an oil separator tank and cast-in-place concrete walls and floors within the truck dump facility.
The project concluded with removal of obsolete infrastructure and site restoration, delivering a modern, resilient facility designed to support Monticello’s long-term wastewater treatment needs.